This is our problematic bridge until now not fixed

Cagayan de Oro bridge
@cacay1 (32875)
Cagayan De Oro, Philippines
March 14, 2017 12:05am CST
Hi friends? I shared you last time our bridge ongoing renovation but shown was not the real problematic road. Until this time we suffer here traffic problem that almost reaches heaven ,LOL.Because of this bridge, I am always sleepy because I have to wake up at 3 in the morning to prepare everything and to walk crossing the deadly bridge.When I arrived home I am super tired and sleepy so no more chance to visit here, so sickening. I am so sorry for the delayed replies to your comments an interactions. I have some vacant minutes in the faculty office and draft this line to let you know we are not yet okay here. It also rains here almost everyday, non-stop problems of flood, slippery and muddy roads. Thank you guys, I miss you all and Mylot.
14 people like this
16 responses
@ilocosboy (34311)
• Philippines
14 Mar 17
Lets see it in positive ways, the moment of distraction to us right now is heaven after it was fully build... even in our place, heavy traffic everyday because of construction and rehabilitation of national highways and bridges.
3 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
It won't be made positive almost 7 years undone bridge.
3 people like this
@ilocosboy (34311)
• Philippines
15 Mar 17
@cacay1 seven years in not yet finish... that could be the longest bridge in the Philippines
3 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
@ilocosboy , not longest the longest katangahan of the UKC builders and the longest corruption made.
1 person likes this
@carexing25 (1830)
• Philippines
14 Mar 17
where is this bridge located? here in my area highways are being reconstructed and it causes heavy traffic..
3 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
14 Mar 17
Cagayan de oro
1 person likes this
@SIMPLYD (79610)
• Philippines
14 Mar 17
Really it is rainy there? Here it has also rained since last Saturday until yesterday. But today it's already sunny. I think that bridge will take a while before it can be repaired. What the government can do is perhaps make a temporary route where the vehicles can pass through.
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
Yes, almost daily and I also bring back and forth my boots hehehe. I am so tired bringing heavy camouflage boots.I am afraid to walk in flood so yucky better sacrifice like this.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
Try to look at the equipment seen so obvious UKC then beside VOLVO.thick faces contractors.
2 people like this
@SIMPLYD (79610)
• Philippines
15 Mar 17
@cacay1 You mean those are the government equipment?
1 person likes this
@pammooratan (4686)
• India
14 Mar 17
Surprising.
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
That is true.
1 person likes this
• India
16 Mar 17
@Lupita234 fine ....and you.
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
@Lupita234 still problematic here of our road.
@JudyEv (123170)
• Bunbury, Australia
14 Mar 17
This does look like a huge problem. I hope they are able to fix it soon.
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
Yes Judy very big problem for the commuters daily for work and school and this is the same road in going to airport, so plane passenger stay in airport 1 day before if flight is earlier, they cannot catch up the plane on or before the time of flight.
2 people like this
@JudyEv (123170)
• Bunbury, Australia
15 Mar 17
@cacay1 Goodness then all transport is very disrupted by this problem.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
@JudyEv . That is right Judy, it takes them to cross or pass almost 2 to three hours. Others sleep in their vehicle.
1 person likes this
@thelme55 (14552)
• Germany
15 Mar 17
So sorry to hear your problem. I wonder why this bridge is not yet done. I hope there will be a solution soon.
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
The builder is so corrupt and the pay for its workers too small and they hired even elementary graduate, no skills for sure.
1 person likes this
@thelme55 (14552)
• Germany
17 Mar 17
@cacay1 it seems the same problem as usual. I hope though that this bridge will get better soon so you don't have to walk for going to the university and coming home.
@ShifaLk (7483)
• India
14 Mar 17
Oh no'! Much problem.! I hope thy get better soon!!!
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
We hope here to have it done fast but strong.
2 people like this
@acelawrites (10931)
• Philippines
14 Mar 17
It really looks problematic! Look there's no iron reinforcements/matting to make the road/bridge stronger.
2 people like this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
That is true, that is the part soil corroded and one passenger fell to the ground almost to fell to the river, so deep.
1 person likes this
14 Mar 17
Ouch...
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
14 Mar 17
, Thank you for the feeling.
1 person likes this
14 Mar 17
@cacay1 I hope the people responsible for that solve it soon.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
14 Mar 17
@TheInvisibleMan They are showing some progress this day when I passed by the road.By the way, it's time for me to go to class, bye for now.Thank you.
1 person likes this
@DianneN (77984)
• United States
16 Mar 17
That will take ages to fix. Wow!
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
So true, what if it rains this day or next day, commuters and all to walk again to cross the birdge, so scary , slippery and muddy road it will become.
1 person likes this
@DianneN (77984)
• United States
22 Mar 17
@cacay1 It is scary. Poor you and all those people.
@Beatburn (3912)
• Philippines
15 Mar 17
The story of our life. Someone might be profiting from that again.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
17 Mar 17
Surely like the mayor , architects and builder owners, so corrupt.
1 person likes this
@Beatburn (3912)
• Philippines
17 Mar 17
@cacay1 Makes me wonder if we could ever see our country with less corrupt and more upright people.
@Kandae11 (36855)
14 Mar 17
The road does look bad.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
That is true we are always afraid to pass this undone bridge.
2 people like this
@LadyDuck (156900)
• Switzerland
14 Mar 17
I am sorry you have such difficult times and it seems that the works will go on for many weeks. This is what I imagine looking at your photo.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
It will go on for many weeks or years for this has been 7 years now not done. We are always afraid every time we pass the road, it might collapse. OMG.
2 people like this
@sjvg1976 (18386)
• Delhi, India
14 Mar 17
Oh that's an issue we too face normally in India. I wish authorities will repair it soon and you may get enough sleep.
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
We are hoping it be done fast , very tiring and irritating.
2 people like this
@sishy7 (27647)
• Australia
14 Mar 17
Oh, that looks pretty bad... I hope you'll get enough rest soon!
1 person likes this
@cacay1 (32875)
• Cagayan De Oro, Philippines
15 Mar 17
That is right, very bad looking bridge after the soil corroded.
1 person likes this
@ridingbet (52676)
• Philippines
18 Mar 17
hope the road is fixed now. how are you?