My Project Manager Responded.

@tammys85 (31363)
Baltimore, Maryland
May 7, 2026 12:13pm CST
If you haven’t read my previous post, I had to reach out to my project manager about my current writing order. One of the usual sections (the conclusion) was missing from the outline, so I wasn’t sure if I should include that. She reminded me that this was covered in the list of common rules a few weeks ago. Yep, it sure was, and I agreed with her. I even have that list saved. I admitted it’s been “one of those mornings,” apologized, and thanked her for the quick response. She’s usually nice, so I’m not worried about it. But what’s up with today, lol? It’s just minor things, though, mostly work/tech, and it could be a lot worse. I’m not sweating it (nor am I angry), just thinking out loud. And hey, I’d rather deal with it all now than worry about this stuff when work REALLY picks up. Oh, and if anyone is wondering, the introduction and conclusion sections are required in every order, even if they forget to list them in the outline, lol. Alrighty, back to work I go. With the time zone difference, I never know when work is going to pick up, so I’d like to have this order finished. You can only grab one order at a time. Byeeee. :)
2 people like this
2 responses
@DaddyEvil (174008)
• United States
7 May
I'm glad it was an easy and quick answer.
1 person likes this
@tammys85 (31363)
• Baltimore, Maryland
14 May
Thanks! I think she's the one working with me on the other writing team that I've been mentioning on here. She's really nice and patient.
1 person likes this
@DaddyEvil (174008)
• United States
15 May
@tammys85 You're welcome.
1 person likes this
@AmbiePam (119654)
• United States
7 May
I’m glad they responded in good time.
1 person likes this
@tammys85 (31363)
• Baltimore, Maryland
14 May
Thank yoooou. I had the answer right in front of me, too. D'oh!
1 person likes this