The workers left until tomorrow.

@marguicha (230350)
Chile
April 25, 2019 5:17pm CST
And the house air has a thin dust in spite of all the closed doors. The tub had to be cut in pieces: it was that or having to rent a heavy machine to take it out whole. And then, what would I do with the old tub? All bathroom pieces are awfully expensive. Yet, any old thing (a tub, a washbasin, anything) cannot be sold if it is second hand. I had thought that I would sleep in my room. Yet, I think that I will sleep in the second floor as soon as they take the window out, probably tomorrow. Leticia still has a smile. I hope it lasts.
4 people like this
4 responses
@LadyDuck (502481)
• Italy
26 Apr 19
This kind of dust is horrible, I remember when we bought this house and replaced the shower and the toilets.
1 person likes this
@marguicha (230350)
• Chile
26 Apr 19
It is a thin dust that gets everywhere.
1 person likes this
@marguicha (230350)
• Chile
27 Apr 19
@LadyDuck Every time I need to go to the bathroom, I unconsciously walk to this terrible place with a shut door. And then, I have to climb the stairs to go to the second floor bathrooms
1 person likes this
@LadyDuck (502481)
• Italy
27 Apr 19
@marguicha I know it's horrible, we had this thin dust when we changed the tiles to a downstairs floor.
1 person likes this
@JohnRoberts (109841)
• Los Angeles, California
26 Apr 19
Enjoy the peace while you can.
1 person likes this
@marguicha (230350)
• Chile
26 Apr 19
I will.
1 person likes this
@NJChicaa (127138)
• United States
25 Apr 19
You are on your way
1 person likes this
@marguicha (230350)
• Chile
25 Apr 19
The workers say it will take them 1 week. I count on 2 and a half.
@dya80dya (36805)
25 Apr 19
I can imagine that. It will be difficult until they finish.
1 person likes this
@marguicha (230350)
• Chile
26 Apr 19
I know. But it is very much needed.